This house is the second Certified Passive House completed by Paul McAlister Architects in Northern Ireland and represents a maturing of the detailing and establishment of the Passive House standard as an ideal family dwelling. This rural site to the west of Portadown is relatively large and allows the building to be nestled into the landscape. The architecture of the house has a contemporary feel whilst also reflecting the traditional rural Irish farmhouse. An interesting feature of the house is the two chimneys which are a prominent element of the design.
Images Graphs Figures Description Strategies Building

SummerIsland House : Project images

Click on image to preview full size

Paul_McAlister_Architects_5-4_Scaled.jpg
Paul_McAlister_Architects_Passive_House_Stove.jpg
Paul_McAlister_Architects_Passive_House_Summerisland.jpg
aIMG_1893_2.jpg
CO2 emissionsPrimary energy requirement
Energy target
PassivHaus

Energy and fuel use

Fuel use by type
Primary energy requirement
CO2 emissions
Renewables

Measured data from renewable generation is not yet available.

Fuel use

 Pre-developmentForecastMeasured
Electricity use - - -
Natural gas use- - -
Oil use- - -
LPG use- - -
Wood use- - -
Other Fuel - - -
 Pre-developmentForecastMeasured
Primary energy requirement - - -
Annual CO₂ emissions - - -
Annual space heat demand - - 15 kWh/m².yr

Renewable energy

Electricity generationForecastMeasured
Renewables Technology--
Other Renewables Tech--
Electricity consumed by generation --
Primary energy requirement
offset by renewable generation
--
Annual CO₂ emissions
offset by renewable generation
--

Calculation and targets

Whole house energy calculation method PHPP
Other whole house calculation method-
Energy target PassivHaus
Other energy targets-
Forecast heating load -

Airtightness

 DateResult
Pre-development air permeability test--
Final air permeability test17 June 20170.32m³/m².hr @ 50 Pascals

Project description

StageOccupied
Start date05 October 2015
Occupation date20 July 2017
Location Portadown County Armagh  Northern Ireland
Build typeNew build
Building sectorPrivate Residential
Property typeDetached
Construction typeMasonry Cavity
Other construction type
Party wall construction
Floor area 275
Floor area calculation method Treated Floor Area (PHPP)
Building certification  Passivhaus certified building Passivhaus certified building

Project Team

OrganisationPaul McAlister Architects Ltd
Project lead personPaul McAlister Architects Ltd
Landlord or ClientPrivate Client
ArchitectPaul McAlister Architects Ltd
Mechanical & electrical consultant Paul McAlister Architects Ltd
Energy consultantPaul McAlister Architects Ltd
Structural engineerGeorge Dawson Ltd
Quantity surveyorNA
ConsultantEarth Cycle Technologies
ContractorWeir Construction Ltd

Design strategies

Planned occupancyFive people, all out to work or school on weekdays.
Space heating strategyHeating from oil boiler with underfloor heating; Heat recovered from ventilation exhaust.
Water heating strategyFrom main heating system
Fuel strategyMains electricity.
Renewable energy strategy4 kWp photovoltaic panel installed .
Passive Solar strategyWindow proportions optimised using PHPP.
Space cooling strategyNA
Daylighting strategyNA
Ventilation strategyComfort ventilation with heat recovery (winter) Openable windows (summer)
Airtightness strategy Airtight membrane over roof structure sealed to outside face of external masonry wall. Masonry wall plastered to provide continuous air barrier with membrane.
Strategy for minimising thermal bridges Thermal bridging analysis undertaken for all primary junctions interfaces Junctions assessed include: Ground floor junction, external corner, party wall, party roof, party floor, eaves, verge, window jamb, head and sill, door jamb, head and threshold.
Modelling strategyWhole house modelling was undertaken in PHPP and dynamic simulation was used to assess the impact of our proposed solar-combi heating system with the results fed back into PHPP
Insulation strategyNA
Other relevant retrofit strategiesNA
Contextual informationNA

Building services

Occupancy
Space heatingA-rated Condensing oil boiler
Hot waterFrom Main system
VentilationMechanical Ventilation Heat recovery
ControlsRoom thermostat, set points for MVHR
CookingElectric hob (induction preferred) and oven
Lighting100% LED Fittings
AppliancesA+ Rated fridge, freezer and washing machine to each unit
Renewable energy generation systemSolar PV Installed
Strategy for minimising thermal bridgesPsi values have been calculated for internal and external values. External psi-value have been entered into PHPP.

Building construction

Storeys 2
Volume 687
Thermal fabric area -
Roof description Warm Roof Construction
Roof U-value 0.11 W/m² K
Walls description Cavity Wall
Walls U-value 0.13 W/m² K
Party walls description NA
Party walls U-value 0.00 W/m² K
Floor description Suspended Pre cast concrete slab, insulation and sand/cement screed
Floor U-value 0.09 W/m² K
Glazed doors description Triple Glazed PVC
Glazed doors U-value 0.71 W/m² K installed
Opaque doors description Composite thermally broken AluClad
Opaque doors U-value 0.73 W/m² K installed
Windows description Triple Glazed PVC
Windows U-value 0.71 W/m² K installed
Windows energy transmittance (G-value) -
Windows light transmittance -
Rooflights description Quadruple Glazed PVC
Rooflights light transmittance -
Rooflights U-value 0.58 W/m² K