Kirsty Maguire Architects worked in collaboration with Hope Homes and Morgan Associates to design and build this farmhouse to the Passivhaus standard. Construction started in August of 2012, and the building was completed and certifed as a Passivhaus 12 months later. The house has a timber frame with I-joists, glulam beams and zinc cladding for the roof, a small wood burning stove, with hot water provided by an air source heat pump.
Images Graphs Figures Description Strategies Building

New Farmhouse : Project images

Click on image to preview full size

Image001_c_Kirsty_Maguire_Architects_Ltd.jpg
Image_002_c_Kirsty_Maguire_Architects_Ltd.jpg
Image_003_c_Kirsty_Maguire_Architects_Ltd.jpg
Image_004_c_Kirsty_Maguire_Architects_Ltd.jpg
Image_005_c_Kirsty_Maguire_Architects_Ltd.jpg
Image_006_c_Kirsty_Maguire_Architects_Ltd.jpg
CO2 emissionsPrimary energy requirement
Energy target
PassivHaus

Energy and fuel use

Fuel use by type
Primary energy requirement
CO2 emissions
Renewables

Measured data from renewable generation is not yet available.

Fuel use

 Pre-developmentForecastMeasured
Electricity use - 6565 kWh/yr -
Natural gas use- - -
Oil use- - -
LPG use- - -
Wood use- - -
Other Fuel - - -
 Pre-developmentForecastMeasured
Primary energy requirement - 101 kWh/m².yr -
Annual CO₂ emissions - 24 kg CO₂/m².yr -
Annual space heat demand - 13 kWh/m².yr -

Renewable energy

Electricity generationForecastMeasured
Renewables Technology--
Other Renewables Tech--
Electricity consumed by generation --
Primary energy requirement
offset by renewable generation
101 kWh/m².yr -
Annual CO₂ emissions
offset by renewable generation
24 kg CO₂/m².yr -

Calculation and targets

Whole house energy calculation method PHPP
Other whole house calculation method-
Energy target PassivHaus
Other energy targets-
Forecast heating load 9 W/m² demand

Airtightness

 DateResult
Pre-development air permeability test--
Final air permeability test-0.22m³/m².hr @ 50 Pascals

Project description

StageOccupied
Start date01 August 2012
Occupation date01 February 2013
Location Ayrshire   Scotland
Build typeNew build
Building sectorPrivate Residential
Property typeDetached
Construction typeOther
Other construction typeTimber Frame I Joists with rainscreen zinc cladding
Party wall construction
Floor area 162.5
Floor area calculation method Treated Floor Area (PHPP)
Building certification  Passivhaus certified building Passivhaus certified building

Project Team

OrganisationKirsty Maguire Architect Ltd
Project lead personKirsty Maguire Architect Ltd
Landlord or ClientPrivate
ArchitectKirsty Maguire Architect Ltd
Mechanical & electrical consultant
Energy consultantCertifier - WARM
Structural engineerMorgan Associates
Quantity surveyor
Consultant
ContractorHope Homes

Design strategies

Planned occupancy
Space heating strategy
Water heating strategy
Fuel strategy
Renewable energy strategy
Passive Solar strategy
Space cooling strategy
Daylighting strategy
Ventilation strategy
Airtightness strategy
Strategy for minimising thermal bridges
Modelling strategy
Insulation strategy
Other relevant retrofit strategies
Contextual information

Building services

Occupancy
Space heating
Hot water
Ventilation
Controls
Cooking
Lighting
Appliances
Renewable energy generation system
Strategy for minimising thermal bridges

Building construction

Storeys 2
Volume -
Thermal fabric area -
Roof description
Roof U-value 0.11 W/m² K
Walls description
Walls U-value 0.11 W/m² K
Party walls description
Party walls U-value -
Floor description Strip foundation with lightweight Thermalite block on internal leaf. Foundation insulated with 220mm Knauf Polyfoam in cavity. 250mm Knauf Polyfoam under slab with perimeter insulated.
Floor U-value 0.13 W/m² K
Glazed doors description
Glazed doors U-value - -
Opaque doors description
Opaque doors U-value - -
Windows description
Windows U-value 0.84 W/m² K -
Windows energy transmittance (G-value) -
Windows light transmittance -
Rooflights description
Rooflights light transmittance -
Rooflights U-value -