Walker Garden Suburb

download as PDF
Download
as PDF
Passive House external structural cladding to inter war garden suburb house

Retrofit for the future ZA590K
Images Graphs Figures Description Strategies Building

Walker Garden Suburb : Project images

Click on image to preview full size

Copy_of_Walker Garden Suburb_Visual.jpg
Picture_309.jpg
Picture_317.jpg
Picture_319.jpg
Walker Garden Suburb_-before.jpg
Walker Garden Suburb_-front.jpg
Walker Garden Suburb_front_bay.jpg
CO2 emissionsPrimary energy requirement
Energy target
Retrofit for the Future

Energy and fuel use

Fuel use by type
Primary energy requirement
CO2 emissions
Renewables

Measured data from renewable generation is not yet available.

Fuel use

 Pre-developmentForecastMeasured
Electricity use - - -
Natural gas use- - -
Oil use- - -
LPG use- - -
Wood use- - -
mains gas - - -
 Pre-developmentForecastMeasured
Primary energy requirement - - -
Annual CO₂ emissions - - -
Annual space heat demand - 18.3 kWh/m².yr -

Renewable energy

Electricity generationForecastMeasured
Renewables Technology--
Other Renewables Tech--
Electricity consumed by generation --
Primary energy requirement
offset by renewable generation
--
Annual CO₂ emissions
offset by renewable generation
--

Calculation and targets

Whole house energy calculation method PHPP
Other whole house calculation method-
Energy target Retrofit for the Future
Other energy targets-
Forecast heating load 12 W/m² demand

Airtightness

 DateResult
Pre-development air permeability test-12.32m³/m².hr @ 50 Pascals
Final air permeability test-6.46m³/m².hr @ 50 Pascals

Project description

StageUnder construction
Start date03 May 2010
Occupation date06 September 2010
Location Newcastle upon Tyne   England
Build typeRefurbishment
Building sectorPublic Residential
Property typeSemi-Detached
Construction typeMasonry Cavity
Other construction type50mm cavity width
Party wall construction250mm solid brick
Floor area 99.8
Floor area calculation method Treated Floor Area (PHPP)
Building certification

Project Team

OrganisationNewcastle City Council
Project lead personNewcastle City Council
Landlord or ClientYour Homes Newcastle / Newcastle City Council
ArchitectDKS Architects / Newcastle City Council
Mechanical & electrical consultant ARUP
Energy consultantVanguard Homes / ARUP
Structural engineerVanguard Homes / Newcastle City Council
Quantity surveyorVanguard Homes / Newcastle City Council
ConsultantInstitute of Energy and Sustainable Development, De Montfort University
Contractort.b.d.

Design strategies

Planned occupancyAdvertised as Passive House with incentives to attract willing family tenant. Proposed as decant unit to act as education / demonstration through occupany.
Space heating strategyMVHR unit with backup mains gas.
Water heating strategySolar water heating.
Fuel strategyMains gas and electricity
Renewable energy strategyNo requirement for renewable electricity to meet Passive House standard.
Passive Solar strategyRear south facing windows with shading / external landscaping.
Space cooling strategyNatural ventilation combined with MVHR unit for summer cooling.
Daylighting strategyKitchen to achieve minimum daylight factor of 2%
Ventilation strategyOpenable windows and MVHR controlled on a room by room basis.
Airtightness strategy External airtight membrane colocated with with external insulation layer. MMC used in bays and pre fitted replacement windows panels.
Strategy for minimising thermal bridges External insulated panel with overlapping layers and taped joints.
Modelling strategyWhole house modelling in PHPP 2007. Phased assessment based upon proposed sequence of interventions.
Insulation strategyExternal insulation to external brick facing to achieve U-value of 0.12 W/m2K. Ceiling insulation with U-value of 0.12 W/m2K and retention of cold roof.
Other relevant retrofit strategies
Contextual informationProposed work in advance of wider retrofit programme for the estate and informed by transferable detailing, materials and scalign of cost benefits.

Building services

OccupancyNULL
Space heatingNULL
Hot waterNULL
VentilationNULL
ControlsNULL
CookingNULL
LightingNULL
AppliancesNULL
Renewable energy generation systemNULL
Strategy for minimising thermal bridgesNULL

Building construction

Storeys
Volume -
Thermal fabric area -
Roof description NULL
Roof U-value 0.00 W/m² K
Walls description NULL
Walls U-value 0.00 W/m² K
Party walls description NULL
Party walls U-value 0.00 W/m² K
Floor description NULL
Floor U-value 0.00 W/m² K
Glazed doors description NULL
Glazed doors U-value 0.00 W/m² K -
Opaque doors description NULL
Opaque doors U-value 0.00 W/m² K -
Windows description NULL
Windows U-value 0.00 W/m² K -
Windows energy transmittance (G-value) -
Windows light transmittance -
Rooflights description NULL
Rooflights light transmittance -
Rooflights U-value 0.00 W/m² K